CTA Loop Renewal

CTA-Red-Line-Photo-3

The $33.8 million project replaced more than two miles of elevated rail and track components that were installed in the early 1980s. It also replaced most elements of the track bed including ties, walkways, etc. The Loop ‘L’ is the heart of the CTA rail system. G.W. Peoples completed a $4.8 million track work portion of the project, providing a full-time yard crew to coordinate materials staging and logistics, and furnished and installed all new DF fasteners, pine track ties, hook bolts, SRS cast tie plates and walkway ties on tangent and curved track. The company also furnished and installed all new 80’ running rail and insulated joints

PROJECT VALUE

$33.8 million

PRIME

Ragnor Benson

OWNER

Chicago Transit Authority (CTA)

REFERENCES

LEARN ABOUT OUR CAPABILITIES

GWP is a DBE/MBE/SBE certified railroad contractor that provides new track construction (replace), rehabilitation, maintenance, repair and removal.

VIEW OUR CERTIFICATIONS

G.W. Peoples is currently certified as a Disadvantaged/Minority owned under streamlined state-wide programs.

logo_sml

ABOUT US

G. W. Peoples Contracting Co., Inc., is a national minority-owned company that specializes in heavy and light railroad and transit construction related activities.

CONTACT US

1100 N Glebe Rd, Suite 1010
Arlington, VA 22201